Solar PV Generation EPC Business

Solar PV Generation EPC Business

At Eguchi Holdings, we provide a number of integrated services that allow us to offer a full turnkey solution as the engineering, procurement, and construction (EPC) contractor and have already been participated numerous projects in Philippines.

Below is brief overview of the key services that create our full turnkey solution:

  • Experience of contractor to construct numerous Solar PV stations.
  • Experience of operator to manage our own Solar PV stations.
  • Experience of manufacturer to create our own Solar PV Branded components “EHJ”.

It is these services that are central to our reputation and success, delivered by our experienced and professional personnel combined with the “Japanese Quality” focused on accomplishing the best long term solution for your business.

 

Case Study of Solar PV Stations in Philippines

Our Global Campaign for International Solar PV Generation EPC Business was started from Philippines. Following case studies are some of our achievements.

BSP Main Office & Mint Bureau / Manila

We, Eguchi Holdings are the 1st Japanese company to won a competition for the Solar PV generation systems as part of the Environmental Energy Development Business managed by PNOC whom consigned by the Government.
With the construction works comprised by 2 locations: 200kW at BSP Main Office and 400kW at BSP Mint Bureau, completed at 31st May 2017, the plant commenced its operations at 10th July 2017.

Poultry House / Malaya, Rizal

This project was the first oversea project conducted by Eguchi Holdings.
We have conducted to construct a roof-top solar PV generation plant on the poultry house in Malaya, Rizal.
With the construction works started from Aug. 2016 and the plant commenced its operations from Feb. 2017.

Solar PV Generation Plant / Alcala, Cagayan

We have conducted to construct a 40kW solar PV generation plant at the land owned by the city hall. All of the generated powers are consumed by the city hall.
With the construction works started from Feb. 2017 and the plant commenced its operations from Apr. 2017.